For Prestressed Rural Girder, design standards: 22TCN Rural product Technical specifications and acceptance”, 22 TCN 22 TCN 05 “Specification for bridge design” TCN – 98 “Work execution and acceptance regulations” TCN “Steel. TCVN Earth works – Construction and Acceptance 22TCN Bars for Pre-stressing Concrete 22TCN Construction and Inspection of.

Author: Dugrel Tora
Country: Maldives
Language: English (Spanish)
Genre: Personal Growth
Published (Last): 11 August 2004
Pages: 288
PDF File Size: 11.27 Mb
ePub File Size: 5.56 Mb
ISBN: 583-7-96656-336-3
Downloads: 47055
Price: Free* [*Free Regsitration Required]
Uploader: Daizilkree

Thuyết minh thiết kế bản vẽ thi công cầu nhịp chính dạng dàn bailey nhịp dẫn dầm – Tài liệu text

Bridge length and embankment height are limited, and construction is easier. Every year, this area is often flooded for several months 22txn the flood season.

Kt cu b tng v b tng ct thp ton khi So, we must build a new bridge, remove the existing bridge complete then dredge the canal. From comparison of 2 options, 2247-98 chooses the option of Bailey for middle span because it is cheaper.

The biggest monthly average absolute humidity is about This location was chosen to satisfy the following requirements: The total of annual rainfall is about Tiu chun thit k: Use product of Co Khi An Giang factory, transport to the site by waterway with the distance is The bridge is only used for motorbike and waking.

Related Posts  74594 DATASHEET PDF

Thuyết minh thiết kế bản vẽ thi công cầu nhịp chính dạng dàn bailey nhịp dẫn dầm I18m tiếng anh

Tien Giang and Hau Giang with dense system of canals, which serving for transportation and for irrigation, divided this area. Drawings – Volume 3: Ph gia C chng ch k thut, c cc c quan qun l Nh nc cng nhn: Railing is shape steel has been rusted heavy.

Special concrete ways, including the way the concreting pressure Use precast girders from Binh Minh factory, transport to the site by waterway with the distance is The physical-mechanical characteristics are as following: Double bituminous surface treatment with 2 layers standard 3. Route must be operated safely and smoothly during flood season.

Commentary – Volume 2: Those bridges in area of 03 provinces: Using the driven pile is suitable. Admixture Recognized by State Control Agencies, having suffcient technical certificates: This design report is made for My An Bridge. ASTM A hoc tng ng.

Related Posts  COBB 500 BROILER MANAGEMENT GUIDE DOWNLOAD

Projects of 13 bridge is part of Component B – Phase I of project, aiming to upgrade and return the existing bridges crossing the Waterway Corridor No. Existing bridge has spans arranged: The elevation system is national system.

According to the Terms of Reference and other documents: According to measurement results in Cao Lanh station, the total sunshine hours are When designing this 22tc, should ensure conformity with general development plan and not obstruct the flow. Khi to d ng lc: Monthly average absolute humidity is presented in the table below.

The flood impact on this area is not large. Thien Ho Bridge with 2 lans and HL93 live load. Deck slab is reinforce concrete 30MPa 10cm thick and 5cm of reinforce concrete 30MPa for cover.